Labs Unlisted preview
Road Safety Projects
Arlington has a lot of street safety work going at once, and it’s hard to tell where any one project stands. This page tracks the big three, Park Ave, Mass Ave at Appleton and Broadway, plus a few smaller ones.
Tap a project on the map to see what it does, where it stands and what comes next.
Every project
The big three first, then the rest by how far along they are. Tap one to see it on the map.
Sources and limits
- Status comes from public records: Select Board agendas and minutes, Transportation Advisory Committee (TAC) and Bicycle Advisory Committee packets on the town’s meeting portal, and town news posts. Each project lists the records I used, and each status says the date it’s current to.
- Committee minutes are usually approved a month later and posted in the next meeting’s packet, so a link to a packet sometimes holds the minutes of the meeting before it.
- Dates in “What comes next” are the town’s or the MWRA’s plans as of the date shown. Construction dates slip, often because of utility work, so read them as targets.
- Lines on the map show roughly where each project is. I traced them from street intersections in OpenStreetMap, not from the design plans.
- The stages are my own shorthand. “Planning” means there’s money to design it but no designer at work yet. “Ready to build” means the design or vote is done and it’s waiting on money, a contractor or other work.
- This isn’t every project. I left out repaving, sidewalk and curb ramp work that isn’t mainly about safety, and smaller fixes like signs and crosswalk flags. The TAC Tracker follows those.
- Updated by hand.